Westfield Bondi Junction
Project type
Air Conditioning
Location
Bondi Junction
Client
Scentre Group
Industry
Retail
The scope of works covered the provision of the mechanical services for the upgrade of L26 Chiller Plantroom, including warranty, service and maintenance for 12 months of the following works:
- Installation of 2 new York Chillers in level 27
- Supply and Installation of mechanical services, chilled water for the chillers, including a new system header in L27
- Extension of chilled water pipework for chillers 2 & 4 to new header in L27
- Extension of secondary chilled water pipework from existing North and South risers to L27
- Supply and installation of 6 new pumps
- Installation of new cooling tower (CT) in L28
- Refurbishment of 2 existing cooling towers in L28
- Supply and installation of a new 200 mm diameter balancing line between the existing 2 CTs and the new CT
- Supply and installation of new low harmonic VSDs for new equipment
- Supply and installation of insulation for new chilled water pipework
- Supply and installation of new flow meters for the chilled water system
- Supply and installation of new flow meters for the condenser water system.
- Supply and installation of 2 new MSSBs
- BMS to suit new works, including relocation of existing equipment to L27
- Rigging and cranage of new equipment
- Supply and installation of ductwork c/w associated fittings such as dampers for plantroom ventilation.
- Supply and installation of new chilled water pipework at P3 QPMCM