Westfield Bondi Junction - Mechanical Services

Project type

Mechanical Services

Location

Bondi Junction

Client

Scentre Group

Industry

Retail

Contract Value

$5.5m

Duration

6 Months

Completed

January 2025

PROJECT OVERVIEW
Beaver Williams delivered a major mechanical services upgrade across Levels 26–28 of Westfield Bondi Junction. The six-month project included installation of two new YORK water-cooled chillers, a new cooling tower, refurbishment of existing cooling towers and extensive associated mechanical, electrical and building controls works. The centre remained operational throughout the works, with the major crane lift undertaken at night.

THE CHALLENGE
Major HVAC plant and supporting equipment had to be lifted to the upper levels of an occupied retail complex. Access constraints required temporary openings through precast panels at Levels 28 and 29, careful handling of heavy equipment and coordination around ongoing centre operations.

THE APPROACH
The lifting scope provided for engineered assessment and certification of a beam for winch use, temporary removal and reinstatement of precast panels, height-safety guardrails, crane and rigging services, and traffic control. The crane lift was undertaken at night to support delivery in an operational centre.

MECHANICAL SERVICES DELIVERED
• Two YORK water-cooled chillers installed at Level 27
• New cooling tower at Level 28 and refurbishment of existing towers
• New pumps, chilled and condenser water pipework, headers, valves and flow/thermal meters
• New mechanical switchboards, low-harmonic VSDs and BMS relocation / integration
• Plantroom ventilation, refrigerant monitoring and associated safety systems
• Pipework headers allowing for a future two-chiller expansion

DELIVERY IN A LIVE ENVIRONMENT
Works spanned multiple plant levels and required coordination of mechanical services, electrical works, controls, rigging and access modifications.

FUTURE EXPANSION
Chilled water infrastructure designed to accommodate two additional chillers.

ONGOING SUPPORT
12-month servicing provision following installation.

CAPABILITY
This project demonstrates Beaver Williams’ experience delivering major HVAC plant upgrades that require large crane lifts, engineered access solutions and specialist rigging within an operating commercial property. It is directly relevant to projects where plant replacement must be carefully staged around site access, safety, operational continuity and integration with existing building services.

COOLING TOWER INSTALLATION & REFURBISHMENT
The Level 28 works combined installation of a new cooling tower with extensive refurbishment of existing towers and upgrades to the condenser water network serving the Level 27 chiller plant.

NEW COOLING TOWER INSTALLATION
Installation of a new cooling tower, support frame, valves and associated condenser water pipework. The scope included stainless steel pipework, a new balancing line, flow metering, VSDs and associated cabling.

EXISTING TOWER REFURBISHMENT
Mechanical refurbishment included motors, fan shafts, fan assemblies, pulleys and belts. Internal works covered fill, air inlet louvres, spray nozzles, cleaning and resealing, plus replacement of corroded support legs.

SYSTEM INTEGRATION
New and refurbished towers were connected to the upgraded condenser water infrastructure and chiller plant.